Sunday, January 3, 2016

Failure in Krakow: Pipeline repaired in the coming hours will return to heat apartments – rmf24.pl

The new elements of the pipeline have already been installed, it takes to fill the tank with hot water – this, as he told us the duty of the Municipal Enterprises Thermal Energy in Krakow, the last steps on the way to removing the great failure of the heating in the capital of Malopolska. Because of the accident, which occurred at the intersection of Radzikowskiego and Stachiewicz, heating have since yesterday, residents of more than 300 homes. If the water supply apparatus works without reservations, the heat is expected to return to homes within the next few hours.

The reason for failure was a “material defect” – burst heating pipes plastic housing. Firefighters had to first pump the water from the pipeline, and only then employees of the Municipal Enterprises Thermal Energy could go down and start working. Inside the plastic casing is bursting and we will have to replace the section of the pipeline – reported yesterday Marek Korzeniak with MPEC-in.

At night, we managed to repair the pipeline and is now filled with water. Back to normal, but it will take several hours. As reported by RMF FM reporter Paul Pawlowski, the water in the pipe is only 40 degrees, and eventually will have 120. The entire operation must be divided into stages – the network under the influence of temperature shrinks and expands, because water is heated slowly – all in order to avoid another failure.

As stated the Urban Heat Supply Company in Krakow, without heating are residents of 57 streets : Arciszewskiego, Army, Balicka, Bandtkie, Bronowicka, Bzymka-Strzałkowski, Chełmońskiego , Conrad, bonnets, Czerwieńskiego, Dytmara, Ehrenberg, Elsner, Glowacki, Gniezno, Upper, Jablunkov, Jarema, Justowska, Kowalski, Krakusy 1A, Kwiatkowski, Lentz, Linde Machaya, Mehoffera, Młynarski Murarska, on a membrane, Nałkowski, Low , Ochlewski, Pilecki, Popiel, Prystor, Pużaka, Radzikowskiego, Rodakowskiego, Różyckiego, Rydel, Stanislavsky, Stańczyka, Stróżeckiego, contacts, Szablowskiego, grassy, ​​Walewski-Wallek, Weiss, Wedding, Vienna, Lupine, Wjazdowa, Wysocki, Zapolskiej, Zarzecze , Golden Horn, Sigismund. 180 houses and 255 multi-family buildings .

(edbie)

LikeTweet

No comments:

Post a Comment